The garage has been lifted and is now secure with a new wall! The left side is supported by the new wall--a few more boards to tie in the left side to the right and the structure has been brought back to life.
Next steps--a new roof. The left side needs plywood down on the roof first. The right side has plywood that look pretty decent. Ripping off the roof Sunday--goal by the end of the day Sunday is to have at least the tar paper down. A lot of work between then and now!
Picture show the new studs sistered to the old ones. The new sole plat is down on the new concrete pad. Right after this picture was taken I threw up a wall of plywood over these new studs to make the structure even more secure.
This picture show the new wall attached at the bottom to the new sole plate.
No comments:
Post a Comment